# The image is ~1.4 GiB compressed - by a wide margin the largest in this # repo, because LibreOffice, Calibre, ImageMagick, ffmpeg, Inkscape and a TeX # Live installation are all inside it. One layer alone is 1354 MiB. # # The rollout wait therefore has to cover the PULL, not just the start: the # runner reference point is 96 MB in 17.5s, which puts this image in the # region of five minutes of pulling before the container is even created. On # top of that comes the startup probe budget (30 x 10s = 300s), which is # generous because ConvertX shells out to ~20 converter binaries at import # just to log their versions. # # MEASURED, and the estimate was wrong in the safe direction: the first green # install-test of this chart (Gitea PR #61) took 2m35s for the WHOLE job - # cluster creation, fixtures, pull, install and rollout wait together. The # 96 MB/17.5s reference does not transfer to ghcr.io on this runner. # # 900s stays anyway, and deliberately. A rollout-wait timeout is a ceiling, # not a cost: kubectl waits exactly as long as the rollout needs, so a # generous number is free on a good day and only spends time on a chart that # is already failing. What it buys is the bad day - a cold registry, or a node # that has to extract the 1354 MiB layer onto slow disk. The default of 300s # would have no headroom at all for either. INSTALL_TIMEOUT=900