WIP: feat(convertx): new chart for ConvertX (1.0.0+upv0.19.0) #61

Draft
jlab-bot wants to merge 2 commits from feat/convertx-chart into main
pull from: feat/convertx-chart
2 changed files with 12 additions and 2 deletions
Showing only changes of commit 7ff54eecf7 - Show all commits

No files matched your search

+1
View File
@@ -164,6 +164,7 @@ Why it exists at all: the answer arrived once by accident. Gitea PR #48 correcte
- **Exclusions come from the one parser**, `ci/run-install-test.sh --list-excluded`, and the excluded charts appear in the job summary **with their justification**, exactly as in the PR pipeline.
- **The result is written down.** Every matrix leg records its own outcome next to the four facts that decide what the outcome means — date, runner label, `K3S_IMAGE`, `kubectl` version — and a final job records the verdict over the whole matrix. A green run nobody notes is unknown again next time. Per leg and not as one table, because a matrix leg only ever sees its own job summary.
- **Expected runtime: 20 charts in 12m41s** (Gitea PR #48, one job, all legs concurrently on one Docker daemon). The figure is there so a later deviation is visible as one; compare it against the chart count the run prints in its own summary — 24 at the time of writing, and one more with every new chart. The job timeout is 30 minutes per leg and lives in `install-test.yml`, i.e. it is the same for both callers on purpose.
- **A big image does not move that figure as much as it looks.** `convertx` was expected to, at ~1.4 GiB compressed — by a wide margin the largest image in the repo, and the reason its `settings.env` raises `INSTALL_TIMEOUT` to 900s. Measured on its first green run (Gitea PR #61) the whole leg took **2m35s**, cluster creation and rollout wait included, so it sits inside the existing envelope rather than setting a new one. Worth knowing before the next raised timeout is read as a prediction about the total: the legs run concurrently, so what the all-charts figure tracks is the **slowest** leg plus scheduling, not the sum of the pulls.
## Dependency updates (Renovate)
+11 -2
View File
@@ -9,6 +9,15 @@
# generous because ConvertX shells out to ~20 converter binaries at import
# just to log their versions.
#
# 900s is pull + a full startup budget with room left over. The default of
# 300s would not even cover the pull.
# MEASURED, and the estimate was wrong in the safe direction: the first green
# install-test of this chart (Gitea PR #61) took 2m35s for the WHOLE job -
# cluster creation, fixtures, pull, install and rollout wait together. The
# 96 MB/17.5s reference does not transfer to ghcr.io on this runner.
#
# 900s stays anyway, and deliberately. A rollout-wait timeout is a ceiling,
# not a cost: kubectl waits exactly as long as the rollout needs, so a
# generous number is free on a good day and only spends time on a chart that
# is already failing. What it buys is the bad day - a cold registry, or a node
# that has to extract the 1354 MiB layer onto slow disk. The default of 300s
# would have no headroom at all for either.
INSTALL_TIMEOUT=900