docs(convertx): record the measured install-test time
Validate Helm Charts / Detect changed charts (pull_request) Successful in 3s
Validate Helm Charts / Resource quantities (pull_request) Successful in 8s
Validate Helm Charts / Build ${{ fromJSON(needs.detect-changed-charts.outputs.charts) }} (pull_request) Successful in 4s
Validate Helm Charts / Trivy config ${{ fromJSON(needs.detect-changed-charts.outputs.scan-charts) }} (pull_request) Successful in 10s
Install-test / Install-test ${{ fromJSON(inputs.charts) }} (pull_request) Successful in 2m32s
Validate Helm Charts / Install-test (pull_request) Successful in 2m32s
Validate Helm Charts / Detect changed charts (pull_request) Successful in 3s
Validate Helm Charts / Resource quantities (pull_request) Successful in 8s
Validate Helm Charts / Build ${{ fromJSON(needs.detect-changed-charts.outputs.charts) }} (pull_request) Successful in 4s
Validate Helm Charts / Trivy config ${{ fromJSON(needs.detect-changed-charts.outputs.scan-charts) }} (pull_request) Successful in 10s
Install-test / Install-test ${{ fromJSON(inputs.charts) }} (pull_request) Successful in 2m32s
Validate Helm Charts / Install-test (pull_request) Successful in 2m32s
The first green install-test of the chart (Gitea PR #61) took 2m35s for the whole leg - cluster creation, fixtures, pull, install and rollout wait together. The estimate in settings.env had been around five minutes for the pull alone, extrapolated from the runner's 96 MB/17.5s reference; that reference does not transfer to ghcr.io on this runner. INSTALL_TIMEOUT stays at 900s. A rollout-wait timeout is a ceiling, not a cost - kubectl waits exactly as long as the rollout needs - so the headroom is free on a good day and only spends time on a chart that is already failing. The comment now states the measurement next to the reason. README gets the other half: a 1.4 GiB image was expected to move the all-charts expectation from Gitea #52 and does not, because the legs run concurrently and that figure tracks the slowest leg rather than the sum of the pulls.
This commit is contained in:
2 files changed
+12
-2
No files matched your search
@@ -9,6 +9,15 @@
|
||||
# generous because ConvertX shells out to ~20 converter binaries at import
|
||||
# just to log their versions.
|
||||
#
|
||||
# 900s is pull + a full startup budget with room left over. The default of
|
||||
# 300s would not even cover the pull.
|
||||
# MEASURED, and the estimate was wrong in the safe direction: the first green
|
||||
# install-test of this chart (Gitea PR #61) took 2m35s for the WHOLE job -
|
||||
# cluster creation, fixtures, pull, install and rollout wait together. The
|
||||
# 96 MB/17.5s reference does not transfer to ghcr.io on this runner.
|
||||
#
|
||||
# 900s stays anyway, and deliberately. A rollout-wait timeout is a ceiling,
|
||||
# not a cost: kubectl waits exactly as long as the rollout needs, so a
|
||||
# generous number is free on a good day and only spends time on a chart that
|
||||
# is already failing. What it buys is the bad day - a cold registry, or a node
|
||||
# that has to extract the 1354 MiB layer onto slow disk. The default of 300s
|
||||
# would have no headroom at all for either.
|
||||
INSTALL_TIMEOUT=900
|
||||
Reference in new issue
Block a user